A Fuzzy Approach for Generalized Project Selection and Scheduling Problem with Resource Management

Cilt: 6 Sayı: 1 30 Haziran 2022
PDF İndir
EN

A Fuzzy Approach for Generalized Project Selection and Scheduling Problem with Resource Management

Abstract

In this study, the problem of project selection and scheduling with resource management is considered project setup times, dynamic project arrivals, priorities and relationship between projects. A fuzzy multi-objective mixed integer linear programming (MILP) model is proposed for the solution of the problem. The classic two-phase fuzzy goal programming (FGP) approach is modified to solve the proposed multi-objective MILP model. The addressed problem is defined over the project selection and scheduling problem of a construction company. The effect of resource management on the project selection and scheduling problem is demonstrated over the generated test problems. Modified two-phase FGP and classic two-phase FGP approaches are compared over test problems. With the use of the modified two-phase FGP approach, additional alternative solutions are found for the problem.

Keywords

Kaynakça

  1. [1] Z. Chen, Y. Lan, R. Zhao, C. Shang, Deadline-based incentive contracta in project management with cost salience. Fuzzy Optimization and Decision Making 18 (2019) 451-473.
  2. [2] A. RezaHoseini, S.F. Ghannadpour, M. Hemmati, A comprehensive mathematical model for resource-constrained multi-objective Project portfolio selection and scheduling considering sustainability and projects splitting. Journal of Cleaner Production 269 (2020) 122073.
  3. [3] X. Li, Y. Wang, Q. Yan, X. Zhao, Uncertain mean-variance model for dynamic project portfolio selection problem with divisibility. Fuzzy Optimization and Decision Making 18 (2019) 37-56.
  4. [4] H. Ke, W. Ma, J. Ma, Solving project scheduling problem with the philosophy of fuzzy random programming. Fuzzy Optimization and Decision Making 11 (2012) 269-284.
  5. [5] M. Shariatmadari, N. Nahavandi, S.H. Zegordi, M.H. Sobhiyah, Integrated resource management for simultaneous Project selection and scheduling. Computers and Industrial Engineering 109 (2017) 39-47.
  6. [6] R. Khayamim, S. Shetab-Boushehrib, S. Hosseininasab, H. Karimi, A sustainable approach for selecting and timing the urban transportation infrastructure projects in large-scale networks: A case study of Isfahan, Iran. Sustainable Cities and Society 53 (2020) 101981.
  7. [7] R. Mahmoudi, S. Shetab-Boushehri, S.R. Hejazi, A. Emrouznejad, P. Rajabi, A hybrid egalitarian bargaining game-DEA and sustainable network design approach for evaluating, selecting and scheduling urban road construction projects. Transportation Research Part E 130 (2019) 161-183.
  8. [8] M.A. Coffin, B.W. Taylor, R & D project selection and scheduling with a filtered beam search approach. IIE Transactions 28 (2) (1996) 167-176.

Ayrıntılar

Birincil Dil

İngilizce

Konular

Mühendislik

Bölüm

Araştırma Makalesi

Yayımlanma Tarihi

30 Haziran 2022

Gönderilme Tarihi

9 Haziran 2021

Kabul Tarihi

25 Şubat 2022

Yayımlandığı Sayı

Yıl 1970 Cilt: 6 Sayı: 1

Kaynak Göster

APA
Bektur, G. (2022). A Fuzzy Approach for Generalized Project Selection and Scheduling Problem with Resource Management. Aksaray University Journal of Science and Engineering, 6(1), 1-16. https://doi.org/10.29002/asujse.950133

Cited By

Aksaray J. Sci. Eng. | e-ISSN: 2587-1277 | Period: Biannually | Founded: 2017 | Publisher: Aksaray University | https://asujse.aksaray.edu.tr