Tüm Arama Uzayını Tarayarak Küçük Ölçekli Kaynak Kısıtlı Proje Çizelgeleme Problemlerinin Çözümü
Öz
Anahtar Kelimeler
Destekleyen Kurum
Kaynakça
- [1] G. Ulusoy, L. Ozdamar, A constrained-based perspective in resource constrained project scheduling. International Journal of Production Research. 32 (1994) 693-705.
- [2] H. Zhang, H. Li, C.M. Tam, Particle swarm optimization for resource-constrained project scheduling. International Journal of Project Management. 24(1) (2006) 83-92.
- [3] R. Kanıt, U.N. Baykan, M. Erdal, Kısıtlı Kaynak Koşullarının Yapı Maliyetine Etkisinin İncelenmesi. Politeknik Dergisi. 8(2) (2005) 209-221.
- [4] F.B. Talbot, An Integer Programming Algorithm for the Resource-Constrained Project Scheduling Problem. Ph.D. Dissertation, Pennsylvania State University, 1976.
- [5] P. Stinson Joel, A Branch and Bound Algorithm for a General Class of Resource-Constrained Scheduling Problems. Ph.D. Dissertation, University of North Carolina at Chapel Hill, 1976.
- [6] E.D. Davis, B.M. Khumawala, Multiple Resource-Constrained Scheduling Using Branch and Bound. AIIE Trans. 10(3) (1978) 252-259.
- [7] R. Kolisch, Serial and parallel resource-constrained project scheduling methods revisited: Theory and computation. European Journal of Operational Research. 90(2) (1996) 320-333.
- [8] D. Merkle, M. Middendorf, H. Schmeck, Ant colony optimization for resource-constrained project scheduling. IEEE transactions on evolutionary computation. 6(4) (2002) 333-346.
Ayrıntılar
Birincil Dil
Türkçe
Konular
Mühendislik
Bölüm
Araştırma Makalesi
Yazarlar
Derya Çakmak
0000-0003-1271-5292
Türkiye
Yayımlanma Tarihi
30 Aralık 2021
Gönderilme Tarihi
11 Şubat 2021
Kabul Tarihi
28 Ekim 2021
Yayımlandığı Sayı
Yıl 2021 Cilt: 5 Sayı: 2
Cited By
Türkiye’de Proje Çizelgeleme Konulu Lisansüstü Tezlerin Bibliyometrik Analizi
İstatistik ve Uygulamalı Bilimler Dergisi
https://doi.org/10.52693/jsas.1596530